Rodeo Grounds Pump Station Backup Power System Replacement

The project consists of removing the existing manual transfer switch and replacing it with a new, automatic one, reworking the wiring and connections on generator conductors between the new automatic transfer switch (AST) and exterior junction box to the left of the utility meter, and replacing the generator with a new generator on the same supports.

Status

Accepting Bids

Bid Date9/25/24 3:00pm

Company & Contacts

Cambria Community Services District
Eric Johnson  

Location

2021 Rodeo Grounds Road, Cambria California

Documents